Yichun Phosphate Mine Water Blocking Project
Water inflow occurred at the TBM working face on March 21, 2022, with a volume of approximately 200 cubic meters/hour. Since the TBM cutter head and the tunnel face are closely connected, it is difficult to accurately determine the specific location of the water. There is no drilling operation space in front of the cutter head, so it must be retreated to a position 9 meters away from the working surface for drilling and grouting to block water. At the same time, in order to prevent the materials injected during the grouting process from influxing into the tunnel, silicate foam materials need to be injected between the TBM shield and the surrounding rock to protect the shield. A total of 1.5 tons of foam material was injected to completely protect the shield. Inject 4 tons of water blocking materials. Completely block the working surface water.
Nano silicon body water blocking project in a mine tunnel
When the auxiliary inclined shaft was constructed to the 440m-550m section, the water spray on the tunnel roof reached more than 38m³/h, and the water inflow after grouting was 0.5m³/h.
service hotline
Address: No.4 Factory Building, Block D, 3P Factory Building, Iron and Steel Industry Service Center, Yuanhe Jingkai District, Yushui District, Xinyu City, Jiangxi Province
Contact: Mr. Feng (Felix) +86 13487563298
Mailbox: felix@lkd-record.com
Copyright©2023 Xinyu RECORD Technology Co., Ltd. All Rights
Powered by www.300.cn
SAF Coolest v1.3 设置面板 ISWSX-ZBYI-FVZEE-ZEA
图片ALT信息: Xinyu RECORD Technology Co., Ltd.
无数据提示
Sorry, the current column has no content for the time being.!
You can view other columns or returnHome Page