Xiangya Road Crossing River Project, China Railway Construction 14th Bureau
PROJECT SUMMARY
Tunnel length: 1.425 km / 1.429 km
Geological conditions: high water pressure, deep overburden, complex soft and hard rock formations
Shield type: mud-water shield 15.01 m
Product type: Shield tail 2200 barrels
Contact Us
Geological conditions: high water pressure, deep overburden, complex soft and hard rock formations
Shield type: mud-water shield 15.01 m
Product type: Shield tail 2200 barrels
Case Details
Tunnel length: 1.425 km / 1.429 km
Geological conditions: high water pressure, deep overburden, complex soft and hard rock formations
Shield type: mud-water shield 15.01 m
Product type: Shield tail 2200 barrels